Moscow, Polikarpova Street, 21.
All sections of the planning and design documentation developed for the construction of the swimming pool building. Architectural supervision. 25-meter swimming pool with five lanes and an acceptance rate of 40 people per shift. The area of the building – 1,913 sq.m. Parameters of the swimming pool basin: 25m. x 8.5 m.х 1.80 m. Works completed. The building put into operation.